Project Overview
Condition led renewal and remodelling of a munitions Road and Rail Transfer facility at HMNB (Clyde)
Deterioration of the concrete embedded rails caused the facility to be withdrawn from operational service in 2011
Services Undertaken
Validation of the derived rail design (GRIP 3) and preparation of the detailed rail design (GRIP 4+5), for a fully concrete embedded depot operating as a road and rail transfer point
Permanent Way design, structural rail concrete slab design, buffer stop specification, bespoke concrete embedded turnout switch clearance and drainage design, rail signage specification and structure gauging analysis
Designs prepared in line with MOD Rail standards
Key Project Specifics
Ministry of Defence rail network
Road / Rail transfer facility
Fully concrete embedded depot
Renewal and remodelling of 5nr sidings
Loco shed, transfer shed and train wash
Track system concrete base / in-fill structural slab design
Bespoke embedded concrete switch clearance design
Strategic slab surface water run-off design
Bespoke turnout switch recess drainage design
Buffer stop specification and over-run assessments
Rail signage specification
Safety demarcation specification
Structure gauging analysis
Value Added by Novus Rail
Nominally £0.2million saving identified and agreed with all relevant stakeholders for utilising an enhanced type of embedded rail / turnout system without any detriment to operations, compliance, performance or safety