Project Overview

New 900m track doubling scheme on Croydon Trams, between Mitcham tram stop and Mitcham junction, to increase capacity on the route

Services Undertaken

Validation of the preliminary design scope (GRIP 3)

Preparation of the detailed track design (GRIP 4+5), to enable the route to be doubled, with inclusion of a new track drainage system design and new safe walking routes

Topographical surveying, Permanent Way design (GRIP 4+5), structure gauging analysis and assessment of lines of sight for divers and passengers

Key Project Specifics

Topographical surveying

Validating preliminary designs scope (GRIP 3)

Permanent Way designs (GRIP 4+5)

Structure gauging surveys

Plain line alignment design

New 1:7 similar-flexure turnout design

Structure gauging analysis

Track drainage design

New walkway design

Preparation of setting out data

Value Added by Novus Rail

Determination on the scope of work to be undertaken and prompt delivery of high quality design submissions