Project Overview

Substantial upgrades to Willesden Traction Maintenance depot and Chingford (London End) sidings to cater for servicing and maintaining the new Bombardier Class 710 which are to be introduced for passenger operations

Locations

Willesden (Traction Maintenance Depot)

Chingford (London End Sidings)

Services Undertaken

Options Selection report for the proposed assets (GRIP 3).

Topographical and structure gauge surveying, and track condition examinations to determine scope of work to the existing locations to accommodate the planned upgrades

Permanent Way design (GRIP 4+5) for new AVIS systems and structure clearance analysis for new cleaning gantries

Establishment of track monitoring system to ensure the construction works do not affect the existing infrastructure

Key Project Specifics

Willesden TMD
New AVIS (Automated Vehicle Inspection System)

New high level cleaning gantries

Options selection (GRIP 3)

Permanent Way design (GRIP 4+5)

Track condition examinations

Plain line design and sidings remodelling

Topographical surveying

Structure gauging analysis

BIM (Level 2) compliance

Chingford Sidings
New AVIS (Automated Vehicle Inspection System)

New high level cleaning gantries

Options selection (GRIP 3)

Permanent Way design (GRIP 4+5)

Track condition examinations

Plain line design

Topographical surveying

Structure gauging analysis

BIM (Level 2) compliance

Value Added by Novus Rail

Minimisation on the scope of track work to be undertaken and ensuring compliant structure clearances at Entry into Service stage, along with the prompt delivery of high quality Permanent Way design submissions