Project Overview

Novus Rail were commissioned to undertake the survey and design for the renewal of wheel timbers at several underbridges in the Anglia region

Locations

Bretts Hill

North Walsham

Occupation Drive

Cantley Lane

River Tas

Manea Bridges

Services Undertaken

Topographical surveying, identification of existing bearer sizes, determination of existing and proposed fastening / packing arrangements

Preparation of the outline and detailed design for the renewal works

Key Project Specifics

Topographical surveys

Track condition examinations

Track layout design

Track level design

3D design strings

Civil engineering design co-ordination

Track construction detailing

Bearer sections and packing schedules

Structure gauging assessments

Construction design (AFC)

Ongoing support throughout the construction phase

Value Added by Novus Rail

Tight installation programme requiring Form A+B designs to be issued within an 8week period, with the AFC a week after receipt of Client review comments.