Project Overview
Novus Rail were commissioned to undertake the survey and design for the renewal of wheel timbers at several underbridges in the Anglia region
Locations
Bretts Hill
North Walsham
Occupation Drive
Cantley Lane
River Tas
Manea Bridges
Services Undertaken
Topographical surveying, identification of existing bearer sizes, determination of existing and proposed fastening / packing arrangements
Preparation of the outline and detailed design for the renewal works
Key Project Specifics
Topographical surveys
Track condition examinations
Track layout design
Track level design
3D design strings
Civil engineering design co-ordination
Track construction detailing
Bearer sections and packing schedules
Structure gauging assessments
Construction design (AFC)
Ongoing support throughout the construction phase
Value Added by Novus Rail
Tight installation programme requiring Form A+B designs to be issued within an 8week period, with the AFC a week after receipt of Client review comments.