Project Overview

A new 1.8km long turnback facility and additional station platform at Stevenage station was required to reduce demand on the East Coast Main Line (ECML), by connecting the new turnback line to the Hertford North branch line.

Locations

Langley junction to Stevenage station.

Services Undertaken

Permanent Way design from feasibility to detailed design stages via the Network Rail GRIP assurance process and also providing technical support during the construction phase

The feasibility design stage was undertaken to ensure that all stakeholder requirements were cost effectively satisfied

The outline and detailed designs were then developed to further mature the design scope and continue to ensure the most cost effective delivery specification

Technical support was provided throughout the construction phase working closely with the installation contractor

As-built surveys were undertaken to ensure the newly constructed turnback facility was in line with the design

Key Project Specifics

BIM (Level 2) compliance

Projectwise Document Control

Plain line design

S&C design, including point motor conversion

Standard deviation assessments

Subgrade and track formation design

Gauging for new structures and station platform

Proposed track category quantification

Preparation of S&C manufacturer drawings

CWR stressing plans

CRT management plan

Track monitoring plan

Inspection and test plans

Derailment risk assessment

Buffer stop over-run assessment

As-built design drawings.

Value Added by Novus Rail

As a repeat client we were able to fit into the clients working processes efficiently and provide dedicated support throughout the full life cycle of the project to ensure successful entry into service and handover to Network Rail