Project Overview

The existing track system was installed during construction of the viaduct and comprised of 113lb flat bottom rail on cast iron baseplates directly fixed to the track slab by anchors, of which approximately 30% had become ineffective from the resonance of train operations

Services Undertaken

Examination of the existing faults and determination of the options that would offer possible solutions

Undertaking necessary surveys and preparing detailed designs for the new anchoring solution, including a comprehensive installation strategy

Project managing the installation phase, supervising the installation work and undertaking hand-back assessments

The works were successfully completed in late 2006

Key Project Specifics

Nexus : Tyne & Wear Metro

Determination of a long-term solution

Options report for dampening fastening solutions

Permanent Way outline and detailed designs

Overlong adjustment switches for viaduct movement

Addressing train bounce from ballast to slab track

Direct fastening design

Project management

Installation contractor supervision

Track hand-back assessments

Value Added by Novus Rail

Determination of a track fastening system that offered a long-term solution to train vibrations affecting the existing anchoring system