Project Overview

Substantial upgrades to East Coast Main Line depots to cater for servicing and maintaining the new Hitachi IEP Class 800 (dual-mode DMU / EMU) and Class 801 (EMU) Super Express Trains, which are to be introduced for passenger operations

Locations

Craigentinny (Edinburgh)

Ferme Park (London)

Doncaster Carr (Doncaster)

Heaton (Newcastle)

Neville Hill (Leeds)

Inverness (Scotland)

Services Undertaken

Topographic surveys, structure gauging surveys, Permanent Way design (GRIP 3-5) and as-built surveying

S&C junction remodelling, new concrete slab and ballasted track form design, plain line and buffer stops

Key Project Specifics

Craigentinny
Topographical and structure gauging surveys
Permanent Way design (GRIP 3-5)
S&C junction remodelling
Renewal / relocation of 4nr sidings, including buffers
New train wash facility
Staging design to suit construction limitations

Doncaster Carr
Topographical and structure gauging surveys
Permanent Way design (GRIP 4-5)
IEP train clearance throughout the depot

Ferme Park
Topographical and structure gauging surveys
Permanent Way design (GRIP 4-5)
Direct fastening design for concrete servicing aprons

Heaton
Topographical and structure gauging surveys
Permanent Way design (GRIP 4-5)
Direct fastening design for concrete servicing aprons

Neville Hill
Topographical and structure gauging surveys
Permanent Way design (GRIP 4-5)
Direct fastening design for concrete servicing aprons

Inverness
Permanent Way design (GRIP 4)

Value Added by Novus Rail

Over £2 million savings were realised at Craigentinny depot by rationalising the outline design prepared by another Consultant, from 12nr turnouts down to 4nr, without compromising key user requirements or functionality needs