Project Overview
New 900m track doubling scheme on Croydon Trams, between Mitcham tram stop and Mitcham junction, to increase capacity on the route
Services Undertaken
Validation of the preliminary design scope (GRIP 3)
Preparation of the detailed track design (GRIP 4+5), to enable the route to be doubled, with inclusion of a new track drainage system design and new safe walking routes
Topographical surveying, Permanent Way design (GRIP 4+5), structure gauging analysis and assessment of lines of sight for divers and passengers
Key Project Specifics
Topographical surveying
Validating preliminary designs scope (GRIP 3)
Permanent Way designs (GRIP 4+5)
Structure gauging surveys
Plain line alignment design
New 1:7 similar-flexure turnout design
Structure gauging analysis
Track drainage design
New walkway design
Preparation of setting out data
Value Added by Novus Rail
Determination on the scope of work to be undertaken and prompt delivery of high quality design submissions